"Since I've had Oplit, my day starts with analysis, not data formatting. And clearly, the day starts better."

"Since I've had Oplit, my day starts with analysis, not data formatting. And clearly, the day starts better."

Hugo Rolet, Logistics Manager at Vaucher Manufacture Fleurier

How Vaucher Manufacture Fleurier saved hours every week and cut planning errors by 75% with Oplit.

About

Vaucher Manufacture Fleurier

A leading expert in high-end mechanical movements, Vaucher Manufacture Fleurier supplies the most prestigious watchmaking brands and remains a key asset for brands seeking access to Swiss Made luxury watchmaking.

They develop, produce and market high-end watch movements, combining industrial reliability with artisanal added value.

Optimizing mid-term production planning is one of their major challenges to manage customer demand.

  • 20 years of activity

  • 212 employees

  • 420 components in their most complex movement

Impact

÷4

reduction in human planning errors.

÷4

reduction in human planning errors.

2 to 5 h

saved per logistician, per month.

2 to 5 h

saved per logistician, per month.

1 day

to master the solution, vs. 15 days previously estimated.

1 day

to master the solution, vs. 15 days previously estimated.

The story

Vaucher Manufacture Fleurier is an expert in high-end mechanical movements, supplying the world's most prestigious watchmaking brands. Managing and monitoring load/capacity is a core challenge in their supply chain and before Oplit, it relied entirely on a manual Excel file that required over an hour of work every week to maintain, handled by a single person, with a significant risk of errors.

The challenge

Before Oplit, Vaucher's load/capacity management relied entirely on a manual Excel file. Updates were done once a week, took over an hour, were handled by a single person, and carried a real risk of error. On more than one occasion, the team was convinced they were on track to hit their weekly targets for a specific machine group, only to discover they were not. Planning was opaque, fragile, and entirely dependent on one individual keeping a complex spreadsheet up to date.

Oplit's approach

Oplit replaced the Excel file with a live load/capacity simulation that updates automatically. What previously took over an hour now happens in minutes, with no manual input, no risk of human error, and full team visibility. Updates that were previously done once a week are now available daily across the entire team.

The solution is used by 6 collaborators 2-3 times per week, and by the production manager on a daily basis. Load/capacity simulations are shared with the entire team every day, making it possible, for the first time, to share the factory's global workload with everyone involved. The scheduling and monitoring of under-capacity and overload situations has become a core part of daily operations.

During budget planning, Vaucher now uses Oplit to run capacity simulations for both headcount and equipment. This allows them to correctly size their workforce and confirm whether new equipment investments are needed, replacing guesswork with data-driven decisions.

Discover other case studies :

From staticplanning to autonomous factory orchestration. Discover the Teknor Apex story.

From static planning to autonomous factory orchestration. Discover the Teknor Apex story.

From Excel chaos to precision planning. Discover the Vaucher story.

Less stress, more decisions. Discover the Lisi Aerospace story.

From chronic delays to ahead of schedule.

How they deployed Oplit across 14 sites in 9 months.

How they deployed Oplit across 14 sites in 6 months.

Flexibility as a competitive weapon. Discover the Ramondin story.

Join 100+ industrial companies

Unlock millions trapped in operational complexity