Where planning breaks and how Oplit fixes it.
[ The problem ]
Planning shouldn't feel like firefighting.
Disconnect between ERP and shopfloor reality
Priorities shift constantly and no teams work off the same list
Bottlenecks are discovered when it's already too late to react
Complex process only in the head of planners
[ The solution ]
One plan. Every team. One truth.
Bridge ERP and shopfloor with a live, accurate model of your factory
Share real-time priorities so every team works from the same list
Surface bottlenecks days ahead, while you still have time to act
Capture planning logic in the system, not in one person's head
[ Proven results ]
Deploy Oplit in weeks.
Measure gains and payback in months.
Across leading industrial manufacturers,
Oplit delivers measurable performance gains:
+25%
On-time delivery
+5%
Throughput
−30%
Lead time
8h
Saved per planner /w
Execution stability is the new normal.
Everything your planners and operators need. In one place.


S&OP and Master Production Scheduling
Build a reliable, constraint-aware master plan automatically.
Define production objectives in line with demand, stocks and capacity constraints
Handle multi-level BOMs and complex routing sequences
Analyze multi-site for group-level oversight
Load & Capacity Balance
See your overloads before they become missed deliveries.
Control load vs. capacity across every work center and machine
Validate objectives in line with demonstrated capacity
Simulate capacity hypothesis to test shift changes, resource reallocation, or new demand



Finite Capacity Scheduling
Stop sequencing jobs manually every morning.
Auto-sequence your full backlog across all work centers
Respect machine availability, setup times, skill requirements, and priorities
Optimize bottleneck utilization first, then cascade across the rest
Shopfloor Dispatch and Execution
Close the gap between planning and execution.
Update priorities automatically when changes occur
Track WIP levels and queue status
Keep planners and operators aligned on the same priorities
Capture and analyze production performance at every work center

From reactive firefighting to structured control
Fast deployment
First results in weeks, not months.
Proven impact
Long-lasting relationships and demonstrated ROI with all our clients including mid-sized factories and industry leaders.
Autonomous no-code configuration
Model your factory and adapt Oplit to your organization, not the other way around.
Native connectors
Native ERP and MES connectors ensure Oplit integrates seamlessly with your existing systems, with APIs for batch or real-time updates
Strong Cybersecurity Policy
Certified SOC2 Type 2, SSO auth, Dedicated infra, Back-up system for data
Reactive & Qualified Support
Strong SLAs and direct support with Oplit internal team
Voices from the field
Fast ROI-driven deployments:
Set-up in 1-2 weeks.
Live in 4-12 weeks.
Payback in 6-9 months.
03
Use and improve
Start recurring use of Oplit to fine tune set-up and solve potential issues. Validate your scheduling processes, conduct first routines and train all users.
04
Move to RUN
Validate project success and prepare further deployment. Fine-tune data flow and start continuously improving Oplit set-up and functioning for your factory.
Ready to stop firefighting?
See how Oplit Core brings structure, visibility, and control to your factory floor in weeks.