Watchmaking

Watchmaking - the 6 decisive planning priorities and the best practices to address them effectively

Watchmaking - the 6 decisive planning priorities and the best practices to address them effectively

Conclusion

Production planning in the watchmaking sector is a decisive component. Between the maximum level of quality expected from a luxury product and the optimal management of the variability of operations due to the multiple, very often manual, adjustments, its stakes are high.



Production planning in the watchmaking sector is a decisive component. Between the maximum level of quality expected from a luxury product and the optimal management of the variability of operations due to the multiple, very often manual, adjustments, its stakes are high. 



Here is a summary of the 6 priorities of production planning in this complex industry.

1- Establish a rework-management process



Issues

  • Quality is paramount in watchmaking, it is the very essence of the sector; consequently, any defect is absolutely prohibited

  • In order to minimize defects, manufacturers multiply quality controls and send a very large number of parts to rework, parts that then add to and compete with the other parts in the production flow.

  • This consequently generates a multitude of small lots to manage and a high complexity in shipping (delays if the last parts are awaited; otherwise, partial shipments)

Best practices

  • It is recommended to carry out quality controls upstream of the production bottlenecks in order to minimize the number of defective parts at these workstations.

  • It is also advisable to reduce the number of quality-control points before the over-capacity workstations and to observe the impact on the quality level at the final control. 





2/ Control your work-in-progress level



Issue 

  • The raw materials used and worked in watchmaking are often precious and expensive metals (e.g. gold, platinum).

  • Reducing the number of parts in production at a given moment in the workshop is therefore critical for the financial health of said workshop.

Best practices

  • Set up work-in-progress control processes (Kanban, CONWIP type) 

  • Allow rapid transport of the product between the end of a step N and its availability at the foot of step N+1. In other words, do what is necessary so as to never have, within a workshop, operations completed several hours earlier.




3/ Carefully monitor subcontracting



Issue

  • Most manufacturers subcontract part of their production process or resort to subcontracting during peak-load periods

  • Poor communication or a lack of anticipation with subcontractors and/or logistics teams can quickly lead to several days or even weeks of delay

Best practices

  • Set up contracts that make it possible to reserve the capacity and availability of your suppliers on critical steps / products. This often comes with a commitment on volume, duration, or price.





4/ Develop in-house the specialized skills that are bottlenecks



Issue

  • Certain skills are today in short supply and highly sought after. It is not uncommon in Switzerland for the recruitment of a beveling specialist (angleur), for example, to take several months.

Best practices

  • Get closer to a school and offer to train their students through work-study programs

  • Create an in-house pool of learners

  • Upskill people in-house

  • Develop your employer brand

  • Retain and unite your teams





5/ Reduce the variability of operations and reduce cycle times



Issue

  • In watchmaking, many trades are manual or require a considerable amount of setup time.

  • Thus, for the same operation, the completion time can vary by a factor of two depending on the person who carries it out.

Best practices

  • Track the performance of each person according to the production step, the reference worked, or the setup put in place. This information can then be synthesized in a two-way table (people / part or setup) that displays in green the most efficient operators on certain parts / setups and in orange those who need support. 

  • Set up training sessions between operators in order to homogenize performance as much as possible and to allow the most experienced people to transmit their knowledge and best practices.





6/ Display clear production priorities to the teams



Issue

  • Too often, the volume of operations carried out daily contains few priority operations due to a lack of communication.

  • Priorities always exist but are not displayed for all to see or easily accessible.

  • Or else, the progress information is not communicated quickly enough.

Best practices

  • Set up a dynamic scheduling system that makes it possible to:

    • Clearly display, everywhere in the workshop, the priorities (more effective than a printed support placed at the workstation).

    • Quickly update the progress of production, the available operations, the unforeseen events, and the priorities (more effective than a printed support or a solution that does not make it possible to interconnect the different workstations with one another).

All of these issues can be addressed in-house, either with rigorous methodology and processes, or thanks to solutions like Oplit, which will foster the communication of your priorities to the field, all the way to the adherence of your objectives on your load-capacity for your planning managers.